Does anyone actually look at their daily equipment availability? Instead of using TEEP that is typically based on calendarized availability, looking at the Daily Equipment Effectiveness Performance of your operation may provide some interesting insights. Working overtime due to material or equipment availability occurs many times. Unfortunately, we find that sometimes these very same machines are idle during the week. A detailed […]
- Advanced Lean Manufacturing
- Availability
- Capacity
- Eliminate Waste
- FREE Downloads
- Lean
- Lean Metrics
- OEE: Overall Equipment Efficiency
- Performance
- Problem Solving
- Process Control and OEE
- Training
Going DEEP with OEE
- Advanced Lean Manufacturing
- Availability
- Lean Metrics
- OEE: Overall Equipment Efficiency
- Performance
- Process Control and OEE
- Training
- Uncategorized
OEE, Downtime, and TEEP
We have received several inquiries regarding equipment down time – periods of time when the machine is not scheduled to run. We consider this to be scheduled down time or idle time and does not affect Overall Equipment Effectiveness (OEE), since no production was planned during this period. OEE measures overall equipment effectiveness during planned production or SCHEDULED up time. Do […]