Tag: OEE Example

OEE For Dedicated – Single Part – Processes

OEE For Dedicated – Single Part – Processes

Definition: 

Dedicated – Single Part – Process:  A process that produces a single product or slight variations on a theme and does not require significant tooling or equipment changeover events.

A single part process is the easiest application for a OEE pilot project.  The single part process also makes it easier to demonstrate some of the more advanced Lean Thinking tools that can be applied to improve your operation or process.  In our “Variation, Waste, and OEE” post, we introduced the potential impacts of variance to your organization.  We also restated our mission to control, reduce, and eliminate variation in our processes as the primary objective of LEAN.

We need to spend more time understanding what our true production capabilities are.  The single part process makes the process of understanding these principles much easier.  The lessons learned can then be applied to more complex or multipart processes.  In multipart or complex operations, production part sequencing may have a significant impact on hourly rates and overall shift throughput.  How would you know unless you actually had a model that provided the insight?

Process Velocity:  Measuring Throughput

Let’s start this discussion by asking a few simple questions that will help you to get your mind in gear.  Do you measure variation in production output?  Do you measure shift rates?  Do you use the “average” rate per hour to set up your production schedules?  How do you know when normal production rates have been achieved?  Does a high production rate on one shift really signify a process improvement or was it simply a statistically expected event?

Once again an example will best serve our discussion.  Assume the following data represents one week of production over three shifts:

Machine A:  Production Process Performance Report

Cycle Time (Seconds):   57      
Shift Standard (440 minutes) 440      
             
Day Shift Planned Quantity
Production Time Total Test Scrap Accept
Mon 1 440 420 1 2 417
Mon 2 440 390 1 1 388
Mon 3 440 320 1 3 316
Tue 1 440 361 1 1 359
Tue 2 440 392 1 5 386
Tue 3 440 365 1 2 362
Wed 1 440 402 1 7 394
Wed 2 440 317 1 6 310
Wed 3 440 430 1 1 428
Thu 1 440 453 1 5 447
Thu 2 440 419 1 3 415
Thu 3 440 366 1 1 364
Fri 1 440 400 1 2 397
Fri 2 440 411 1 4 406
Fri 3 440 379 1 2 376
Totals 15 6600 5825 15 45 5765

The following table is an extension of the above table and shows the unplanned downtime as well actual, standard, and ideal operating times.

Day Shift Unplanned Operating Time
Down Time Actual Standard Ideal
Mon 1 25 415.0 399.0 396.2
Mon 2 55 385.0 370.5 368.6
Mon 3 122 318.0 304.0 300.2
Tue 1 84 356.0 343.0 341.1
Tue 2 65 375.0 372.4 366.7
Tue 3 82 358.0 346.8 343.9
Wed 1 45 395.0 381.9 374.3
Wed 2 130 310.0 301.2 294.5
Wed 3 30 410.0 408.5 406.6
Thu 1 5 435.0 430.4 424.7
Thu 2 40 400.0 398.1 394.3
Thu 3 90 350.0 347.7 345.8
Fri 1 45 395.0 380.0 377.2
Fri 2 45 395.0 390.5 385.7
Fri 3 60 380.0 360.1 357.2
Totals 15 923 5677 5533.8 5476.8

The table below shows the OEE calculations for each day and shift worked.  Note that this table is also an extension of the above data.

Day Shift Overall Equipment Effectiveness (OEE)
Availability Performance Quality OEE
Mon 1 94.3% 96.1% 99.3% 90.0%
Mon 2 87.5% 96.2% 99.5% 83.8%
Mon 3 72.3% 95.6% 98.8% 68.2%
Tue 1 80.9% 96.3% 99.4% 77.5%
Tue 2 85.2% 99.3% 98.5% 83.3%
Tue 3 81.4% 96.9% 99.2% 78.2%
Wed 1 89.8% 96.7% 98.0% 85.1%
Wed 2 70.5% 97.1% 97.8% 66.9%
Wed 3 93.2% 99.6% 99.5% 92.4%
Thu 1 98.9% 98.9% 98.7% 96.5%
Thu 2 90.9% 99.5% 99.0% 89.6%
Thu 3 79.5% 99.3% 99.5% 78.6%
Fri 1 89.8% 96.2% 99.3% 85.7%
Fri 2 89.8% 98.8% 98.8% 87.7%
Fri 3 86.4% 94.8% 99.2% 81.2%
Totals 15 86.0% 97.5% 99.0% 83.0%

The results from the table above suggest that the process is running just short of world-class OEE (83% versus 90% for dedicated processes.  Note that 85% is considered world-class for multipart variable processes).  As you can see from the daily and shift results, a lot of variation is occurring over the course of the week.  This is the opportunity that we need to pursue further.  A quick scan of the data suggests that Wednesday 2nd shift and Monday 3rd shift are the main contributors to the reduced OEE.  We will investigate the data a little further to really understand what opportunities exist.

A dedicated, continuous process should yield a higher OEE since the process is not subject to continual setup and change over.  Although some model changes or variations to the existing product may exist, they are typically less disruptive.  A OEE of 90% may be an achievable target and is typical for most dedicated operations.

FREE Downloads

We are currently offering our Excel OEE Spreadsheet Templates and example files at no charge.  You can download our files from the ORANGE BOX on the sidebar titled “FREE DOWNLOADS” or click on the FREE Downloads Page.  These files can be used as is and can be easily modified to suit many different manufacturing processes.  There are no hidden files, formulas, or macros and no obligations for the services provided here.

Please forward your questions, comments, or suggestions to LeanExecution@gmail.com.  To request our services for a specific project, please send your inquiries to Vergence.Consulting@gmail.com.

We welcome your feedback and thank you for visiting.

Until Next Time – STAY Lean!

"Click"
Advertisements

OEE, Downtime, and TEEP

We have received several inquiries regarding equipment down time – periods of time when the machine is not scheduled to run.  We consider this to be scheduled down time or idle time and does not affect Overall Equipment Effectiveness (OEE), since no production was planned during this period.

OEE measures overall equipment effectiveness during planned production or SCHEDULED up time.  Do not confuse idle time with tooling or material change over as these activities should be part of the scheduled machine time – periods where the machine is not scheduled to run.  After hours or weekends are examples of idle time.

TEEP or Total Equipment Effectiveness Performance is another variable, similar to OEE, and measures the Total Equipment Effectiveness Performance based on calendar time – the total time the equipment is “present”.  If process “A” is in your plant for 24 hours a day, 7 days a week, then the total time required to make good parts is divided by the time the asset, process, or equipment is “present” and is therefore “technically available” for the time frame being considered.  Typically this is based on calendar time – 24 hours per day and 7 days per week.

Another way to view TEEP is to consider it as a measure of how effectively the total capacity of a process or machine is being utilized to make GOOD parts.  In short, TEEP could be defined as a measure of Equipment Capacity Utilization Effectiveness.

TEEP Calculation Example:

In the metal stamping business, raw coil steel is processed through a die that runs in a stamping press to manufacture the parts.  The ideal cycle time for may be 30 strokes (or parts) per minute.  While the press may be scheduled to run for 16 hours, it is technically “present” or available 24 hours.  If, in a given day, a total of 18,000 GOOD parts were produced over 16 hours of scheduled production time, the OEE is easily calculated.

We will first calculate the IDEAL hours required to produce 18,000 parts at 30 spm.  The IDEAL rate per hour is 1,800 parts (30 spm * 60 minutes  / hour).  Therefore the IDEAL time to produce 18,000 good parts is 10 hours (18,000 parts / 1,800 per hour).

If this is a two shift operation, the net available time is 16 hours (scheduled) and the OEE for the day is calculated as 10 / 16 = 62.5 %.

Since the press is always present, 24 hours per day – 7 days per week, the Daily Equipment Effectiveness Performance (DEEP) in this case is 10 / 24 = 41.7 %.  While this example only represents a single 24 hour day, the basis for calculation is the same.  If the time frame is one week, one month, one quarter, the Total Equipment Effectiveness Performance for that time frame is calculated using the following formula:

TEEP = Total IDEAL Time to Produce Good Parts / Total Gross Time Available

FREE Downloads

We are currently offering our Excel OEE Spreadsheet Templates and example files at no charge.  You can download our files from the ORANGE BOX on the sidebar titled “FREE DOWNLOADS” or click on the FREE Downloads Page.  These files can be used as is and can be easily modified to suit many different manufacturing processes.  There are no hidden files, formulas, or macros and no obligations for the services provided here.

Feel free to leave any comments or send your questions to LeanExecution@gmail.com

Until next time – STAY Lean!