The following topics will be featured in an upcoming post, we’ll try to squeeze them in before February 2009 rolls off the calendar. If you have a topic that you would like to see featured on our site, send an e-mail to LeanExecution@gmail.com. Capacity Planning with OEE: By definition, it only makes sense to use OEE as an integral part of your […]
- Advanced Lean Manufacturing
- Lean
- Lean Metrics
- OEE: Overall Equipment Efficiency
- Process Control and OEE
Upcoming OEE Topics – February 2009
OEE and Morale
Is employee morale impacting your OEE? If so, how much of a concern is it? As we wrote in one of our recent posts, “Perhaps the greatest “external” influence on current manufacturing operations is the rapid collapse of the automotive industry in the midst of our current economic “melt down”.  The changes in operating strategy to respond to this new crisis are bound to have an effect on OEE […]
- Advanced Lean Manufacturing
- Availability
- Eliminate Waste
- Lean Metrics
- Performance
- Process Control and OEE
- Quality
Improving OEE: A Hands On Approach
We have explored Overall Equipment Efficiency (OEE) from several perspectives and how it can be used as an effective performance metric. The purpose of measuring and monitoring OEE, at a minimum, should be three fold: To ensure the current performance levels are sustained, To identify new opportunities for improvement, To assess the effectiveness of current improvement initiatives. The Culture of Continuous Improvement and […]
- Advanced Lean Manufacturing
- Availability
- Eliminate Waste
- FREE Downloads
- Lean
- Lean Metrics
- OEE: Overall Equipment Efficiency
- Performance
- Problem Solving
- Quality
- Quality Factor
- Root Cause Analysis
- Training
- Trouble Shooting
Problem Solving with OEE – Measuring Success
OEE in Perspective As mentioned in our previous posts, OEE is a terrific metric for measuring and monitoring ongoing performance in your operation. However, like many metrics, it can become the focus rather than the gage of performance it is intended to be. The objective of measuring OEE is to identify opportunities where improvements can be made or to determine whether the changes to your […]
- Advanced Lean Manufacturing
- Availability
- Capacity
- Eliminate Waste
- Lean
- Lean Metrics
- OEE: Overall Equipment Efficiency
- Performance
- Problem Solving
- Quality
- Training
- Uncategorized
OEE and Standardized Work
Overall Equipment Efficiency (OEE): Standardized Work After you start collecting OEE data for your processes, you may notice significant variance between departments, shifts, and even employees performing the work. Of the many aspects that you will be inclined to investigate, standardized work should be one of them. Making sure that all employees are executing a process or sequence of processes […]
