OEE for Multiple Parts – Single Machine (Multipart Processes)

How to Calculate OEE for Single Machine and Multiple Parts. Flexible manufacturing provides the advantage of producing many different parts on the same piece of equipment.  The same is true for processes such as stamping presses, molding machines, or machining operations. The first question most often asked is, “How do we calculate OEE for a piece of equipment that is capable of manufacturing multiple […]

OEE, Downtime, and TEEP

We have received several inquiries regarding equipment down time – periods of time when the machine is not scheduled to run.  We consider this to be scheduled down time or idle time and does not affect Overall Equipment Effectiveness (OEE), since no production was planned during this period. OEE measures overall equipment effectiveness during planned production or SCHEDULED up time.  Do […]