Does anyone actually look at their daily equipment availability? Instead of using TEEP that is typically based on calendarized availability, looking at the Daily Equipment Effectiveness Performance of your operation may provide some interesting insights. Working overtime due to material or equipment availability occurs many times. Unfortunately, we find that sometimes these very same machines are idle during the week. A detailed […]
- Advanced Lean Manufacturing
- Availability
- Capacity
- Eliminate Waste
- FREE Downloads
- Lean
- Lean Metrics
- OEE: Overall Equipment Efficiency
- Performance
- Problem Solving
- Process Control and OEE
- Training
Going DEEP with OEE
- Advanced Lean Manufacturing
- Availability
- Capacity
- Eliminate Waste
- FREE Downloads
- Lean
- Lean Metrics
- OEE: Overall Equipment Efficiency
- Performance
- Problem Solving
- Process Control and OEE
- Quality
- Quality Factor
- Training
Practical OEE – How To Calculate and Use Weighted OEE
We have presented the methods of calculating OEE for a process and also demonstrated how weighted OEE is calculated for multiple processes. Our next challenge is to determine how this data can be used to make sure we are targeting the right processes for improvement. Over the next few posts, we will show you how to calculate weighted OEE factors for each process. […]