A lot of time and effort is wasted collecting and analyzing data and the results. Fortunately, Overall Equipment Effectiveness, or OEE, is one of those metrics that is easily calculated and can be applied to any process, department, or the entire organization. We have created a number of Excel spreadsheets that are immediately available from our FREE Downloads page or from the […]
- Advanced Lean Manufacturing
- Availability
- Capacity
- Eliminate Waste
- FREE Downloads
- Lean
- Lean Metrics
- OEE: Overall Equipment Efficiency
- Performance
- Problem Solving
- Process Control and OEE
- Quality
- Quality Factor
- Training
How to Calculate OEE – The Real OEE Formula with Examples
- Advanced Lean Manufacturing
- Availability
- Lean Metrics
- OEE: Overall Equipment Efficiency
- Performance
- Process Control and OEE
- Training
- Uncategorized
OEE, Downtime, and TEEP
We have received several inquiries regarding equipment down time – periods of time when the machine is not scheduled to run. We consider this to be scheduled down time or idle time and does not affect Overall Equipment Effectiveness (OEE), since no production was planned during this period. OEE measures overall equipment effectiveness during planned production or SCHEDULED up time. Do […]
- Advanced Lean Manufacturing
- Availability
- Eliminate Waste
- Lean
- Lean Metrics
- OEE: Overall Equipment Efficiency
- Performance
- Process Control and OEE
- Quality
- Quality Factor
- Training
Measuring Effectiveness – Getting started with OEE
Getting Started with Overall Equipment Effectiveness (OEE) – Your definitive guide to Overall Equipment Effectiveness The “internet” is a powerful tool that can provide information in a matter of seconds. Use Google to search for Overall Equipment Effectiveness or OEE and you will quickly receive an overwhelming number of “hits” leading you to the latest promotion selling you on the latest data collection technology […]