We have presented the methods of calculating OEE for a process and also demonstrated how weighted OEE is calculated for multiple processes. Our next challenge is to determine how this data can be used to make sure we are targeting the right processes for improvement. Over the next few posts, we will show you how to calculate weighted OEE factors for each process. […]
- Advanced Lean Manufacturing
- Availability
- Capacity
- Eliminate Waste
- FREE Downloads
- Lean
- Lean Metrics
- OEE: Overall Equipment Efficiency
- Performance
- Problem Solving
- Process Control and OEE
- Quality
- Quality Factor
- Training
Practical OEE – How To Calculate and Use Weighted OEE
- Advanced Lean Manufacturing
- Availability
- Lean Metrics
- OEE: Overall Equipment Efficiency
- Performance
- Process Control and OEE
- Training
- Uncategorized
OEE, Downtime, and TEEP
We have received several inquiries regarding equipment down time – periods of time when the machine is not scheduled to run. We consider this to be scheduled down time or idle time and does not affect Overall Equipment Effectiveness (OEE), since no production was planned during this period. OEE measures overall equipment effectiveness during planned production or SCHEDULED up time. Do […]
