OEE Integration Part VII – What Software Should I Use? Many readers have noted that we have avoided recommending a specific OEE software solution. The reasons for this are as varied as the number of companies looking to implement OEE in their facilities. Our experience suggests that every manufacturing facility has differing or varying needs. A recent Google search produced […]
- Advanced Lean Manufacturing
- Lean
- Lean Metrics
- OEE: Overall Equipment Efficiency
- Process Control and OEE
OEE Integration: What Software should I use?
OEE Calculation Errors
Database Errors We agree that collecting and tracking OEE data is a task best suited for a database, however, all the bells and whistles of an OEE system don’t serve much purpose if the calculations are wrong. Before you make a significant investment in your OEE data collection, tracking, and monitoring system, make sure the system you plan to purchase […]
- Advanced Lean Manufacturing
- Availability
- Lean Metrics
- OEE: Overall Equipment Efficiency
- Process Control and OEE
OEE: Take the Hit
The simplicity of measuring and calculating OEE is compounded by the factors that ultimately influence the end result. Because the concept of OEE can be readily embraced by most employees, it is easy for many people to get involved in the process of making improvements. Unfortunately the variables involved with OEE, like those of many other measurement systems, fall under scrutiny. […]
OEE and Overtime
A number of requests have been received recently that point to a lack of clarity in the definition of Overall Equipment Effectiveness (OEE). One of the questions we were recently asked is: How do you calculate OEE for Overtime hours? Overtime and OEE Our first response is quite simple. OEE doesn’t care whether you are working overtime or straight time. […]
- Advanced Lean Manufacturing
- Capacity
- Cost Control
- Eliminate Waste
- Lean
- Lean Metrics
- OEE: Overall Equipment Efficiency
- Process Control and OEE
- Terminology
Upcoming Topics for March 2009
We have received several topic requests that we will work on for the month of March, 2009. If you have a topic that you would like to see featured on our site, send an e-mail to LeanExecution@gmail.com. OEE on the Shop Floor – Measurement: What should we be measuring to make OEE practical at the shop floor level. What factors […]
- Advanced Lean Manufacturing
- Lean
- Lean Metrics
- OEE: Overall Equipment Efficiency
- Process Control and OEE
Upcoming OEE Topics – February 2009
The following topics will be featured in an upcoming post, we’ll try to squeeze them in before February 2009 rolls off the calendar. If you have a topic that you would like to see featured on our site, send an e-mail to LeanExecution@gmail.com. Capacity Planning with OEE: By definition, it only makes sense to use OEE as an integral part of your […]
- Advanced Lean Manufacturing
- Eliminate Waste
- Lean Metrics
- OEE: Overall Equipment Efficiency
- Process Control and OEE
OEE Measurement Error
How many times have you, or someone you know, challenged the measurement process or method used to collect the data because the numbers just “don’t make sense” or “can’t be right”? It is imperative to have integrity in the data collection process to minimize the effect of phantom improvements through measurement method changes. Switching from a manual recording system to […]
- Availability
- Eliminate Waste
- Lean
- Lean Metrics
- OEE: Overall Equipment Efficiency
- Performance
- Process Control and OEE
- Quality
OEE For Dedicated – Single Part – Processes
OEE For Dedicated – Single Part – Processes Definition: Dedicated – Single Part – Process: A process that produces a single product or slight variations on a theme and does not require significant tooling or equipment changeover events. A single part process is the easiest application for a OEE pilot project. The single part process also makes it easier to demonstrate […]
- Advanced Lean Manufacturing
- APQP
- Availability
- Capacity
- Eliminate Waste
- FREE Downloads
- Lean
- Lean Metrics
- OEE: Overall Equipment Efficiency
- Performance
- Problem Solving
- Process Control and OEE
- Quality
- Root Cause Analysis
- Training
Availability and OEE
What is Availability? In its simplest form, availability measures the uptime of a machine or process against the planned production time. As one of the factors of Overall Equipment Efficiency (OEE), Availability is expressed as a percentage. The uptime is calculated by taking the difference between the planned production time and total duration of the downtime events that occurred during the planned production period. We […]
- Advanced Lean Manufacturing
- Availability
- Eliminate Waste
- FREE Downloads
- Lean
- Lean Metrics
- OEE: Overall Equipment Efficiency
- Performance
- Problem Solving
- Quality
- Quality Factor
- Root Cause Analysis
- Training
- Trouble Shooting
Problem Solving with OEE – Measuring Success
OEE in Perspective As mentioned in our previous posts, OEE is a terrific metric for measuring and monitoring ongoing performance in your operation. However, like many metrics, it can become the focus rather than the gage of performance it is intended to be. The objective of measuring OEE is to identify opportunities where improvements can be made or to determine whether the changes to your […]