Going DEEP with OEE

Does anyone actually look at their daily equipment availability? Instead of using TEEP that is typically based on calendarized availability, looking at the Daily Equipment Effectiveness Performance of your operation may provide some interesting insights. Working overtime due to material or equipment availability occurs many times.  Unfortunately, we find that sometimes these very same machines are idle during the week. A detailed […]

Availability and OEE

What is Availability? In its simplest form, availability measures the uptime of a machine or process against the planned production time.  As one of the factors of Overall Equipment Efficiency (OEE), Availability is expressed as a percentage.  The uptime is calculated by taking the difference between the planned production time and total duration of the downtime events that occurred during the planned production period. We […]

OEE, Downtime, and TEEP

We have received several inquiries regarding equipment down time – periods of time when the machine is not scheduled to run.  We consider this to be scheduled down time or idle time and does not affect Overall Equipment Effectiveness (OEE), since no production was planned during this period. OEE measures overall equipment effectiveness during planned production or SCHEDULED up time.  Do […]