The concept of Standard Work is understood in virtually any work environment and is not exclusive to the lean enterprise. Typically the greater challenge of standardized work is actually preparing an effective document that adequately describes the “work” to be performed. The objective of standardized work is to provide a documented “method” for completing a sequence of tasks that can be […]
Software Modeling for Standardized Work
- Advanced Lean Manufacturing
- Eliminate Waste
- Lean Metrics
- OEE: Overall Equipment Efficiency
- Performance
- Problem Solving
- Process Control and OEE
- Root Cause Analysis
- Training
Lean STAR From 6 Deadly Job Networking Mistakes
Sometimes we are inundated with e-mails especially from some of the “Groups” we subscribe to. Today, one e-mail in particular caught our attention and led us to read a post titled “6 Deadly Job Networking Mistakes” that eventually brought us to a well written article by Gill Corkindale titled, “6 Networking Mistakes And How to Avoid Them“. If you or someone […]
- Advanced Lean Manufacturing
- APQP
- Contingency Planning
- Eliminate Waste
- FREE Downloads
- Lean
- Lean Metrics
- Problem Solving
- Risk Management
- Root Cause Analysis
- Training
- Trouble Shooting
Using TRIZ for Problem Solving – Resources
In our first post on this topic, “Using Triz for Problem Solving – Introduction“, we provided a very basic introduction to TRIZ. In the spirit of TRIZ, it is not our intent to rewrite or redefine the TRIZ process when excellent information is already available. Our intent is to identify the few of the many excellent and exceptional resources that we have found. What is […]
- Advanced Lean Manufacturing
- APQP
- Contingency Planning
- Lean
- Lean Metrics
- Problem Solving
- Root Cause Analysis
- Trouble Shooting
- Uncategorized
Using TRIZ for Problem Solving – Introduction
Using TRIZ for Problem Solving – Introduction A famous quote from Albert Einstein, “The problems that exist in the world today cannot be solved by the level of thinking that created them.“, applies to the discussion of problem solving and more so to the topic of TRIZ, The Theory of Inventive Problem Solving, developed by Genrich S. Altshuller. TRIZ – Theory of Inventive Problem Solving […]
Lean Contingency Planning For Lean Operations – IT and the BSOD
Coincidentally, we are having a first hand experience with the Blue Screen of Death or BSOD with one of our laptops today. The completely unexpected critical system error that renders Windows completely helpless. If this isn’t on your list of IT concerns, it should be. In our case the error appears to be video related – driver or card. Most IT […]
- Advanced Lean Manufacturing
- Availability
- Capacity
- Eliminate Waste
- FREE Downloads
- Lean
- Lean Metrics
- OEE: Overall Equipment Efficiency
- Performance
- Problem Solving
- Process Control and OEE
- Training
Going DEEP with OEE
Does anyone actually look at their daily equipment availability? Instead of using TEEP that is typically based on calendarized availability, looking at the Daily Equipment Effectiveness Performance of your operation may provide some interesting insights. Working overtime due to material or equipment availability occurs many times.  Unfortunately, we find that sometimes these very same machines are idle during the week. A detailed […]
- Advanced Lean Manufacturing
- APQP
- Availability
- Capacity
- Cost Control
- Eliminate Waste
- Execution
- FREE Downloads
- Lean
- Lean Metrics
- Lean Mindset
- OEE: Overall Equipment Efficiency
- Performance
- Problem Solving
- Process Control and OEE
- Quality
- Quality Factor
- Root Cause Analysis
- Terminology
- Training
- Trouble Shooting
- Uncategorized
Welcome to LeanExecution!
Welcome! If you are a first time visitor interested in getting started with Overall Equipment Effectiveness (OEE), click here to access our very first post “OEE – Overall Equipment Effectiveness“. We have presented many articles featuring OEE (Overall Equipment Effectiveness), Lean Thinking, and related topics. Our latest posts appear immediately following this welcome message.  You can also use the sidebar widgets to select […]
Renovations are under way!
We are in the process of updating our site. Stay tuned for more features and updates to come. Thank you for the opportunity to serve you even better. Vergence Business Associates Renovations
- Advanced Lean Manufacturing
- Availability
- Contingency Planning
- Eliminate Waste
- Lean
- Lean Metrics
- OEE: Overall Equipment Efficiency
- Problem Solving
- Process Control and OEE
- Risk Management
- Training
OEE Integration – Where do We Measure OEE? – Part I
OEE Integration Part IX – Where do we measure OEE? Our recent posts have included numerous examples to calculate OEE correctly. We also discussed integration of OEE as an effective metric for managing your processes and ultimately how to analyze and use the data to improve your profitability. We spent little time discussing where this measurement should occur.  OEE can […]
- Advanced Lean Manufacturing
- APQP
- Availability
- Capacity
- Eliminate Waste
- FREE Downloads
- Lean
- Lean Metrics
- OEE: Overall Equipment Efficiency
- Performance
- Problem Solving
- Process Control and OEE
- Quality
- Root Cause Analysis
- Training
Availability and OEE
What is Availability? In its simplest form, availability measures the uptime of a machine or process against the planned production time. As one of the factors of Overall Equipment Efficiency (OEE), Availability is expressed as a percentage. The uptime is calculated by taking the difference between the planned production time and total duration of the downtime events that occurred during the planned production period. We […]